F6150
ÀÇ Æ¯Â¡
F6150 Àü·Â°èÅë ½Ã¹Ä·¹ÀÌÅÍ´Â º¸È£°èÀü±â¸¦ °Ë»çÇϱâ À§ÇØ ¸¸µé¾îÁ³´Ù.
F6150Àº 3°³ÀÇ Àü¾Ð¼Ò½ºµé°ú 3°³ÀÇ Àü·ù¼Ò½ºµéÀ» °¡Áö°í ÀÖ´Ù. °¢ ¼Ò½º´Â Á¤°Ý 150VA ¿¬¼ÓÀü·ÂÀÌ´Ù. °¢ ¼Ò½ºµéÀº 2°³ÀÇ
75VA ¼Ò½ºµé·Î ÃÖ´ë ¾Æ·¡ÀÇ ±¸¼ºÀ¸·Î ¸¸µé ¼ö ÀÖ´Ù. -
6 Voltage source, or
- 6
Current source, or
- 6
Vlotage source and 6 Current source
¼Ò½ºÀÇ
±¸¼ºÀº ³»ÇâÀûÀÌ¸ç ¿©·¯°¡Áö °èÀü±â °Ë»çµéÀ» À§ÇÑ ´Ùä·Î¿î ¿ä±¸ »çÇ×µéÀ» ÃæÁ·½Ã۱â À§ÇØ ÄÄÇ»ÅÍ·Î µ¶¸³ÀûÀ¸·Î Á¶Á¤µÈ´Ù. Àü·ù¼Ò½ºµéÀ»
Á÷·Ä ¶Ç´Â º´·Ä·Î ±¸¼º½ÃÅ´À¸·Î½á, ³ôÀº ºÎ´ãÀÇ °èÀü±â³ª º¸È£½ºÄ·À» °Ë»çÇϱâ À§ÇÑ ´õ ¸¹Àº ÆÄ¿ö¸¦F6150À¸·ÎºÎÅÍ ²ø¾î³¾ ¼ö ÀÖ´Ù.
8°³ÀÇ logic input-output ä³ÎµéÀº º¸È£½ºÄ· ¼º´ÉÀ» Æò°¡Çϱâ À§ÇÑ ¼ö´ÜÀ» Á¦°øÇÑ´Ù. ÇϳªÀÇ µ¶¸³µÈ DC ¹åµ¥¸®
½Ã¹Ä·¹ÀÌÅÍ´Â ¶ÇÇÑ µðÁöÅаú static °èÀü±âµé¿¡ ±¸µ¿Àü¿øÀ» °ø±ÞÇÒ ¼ö ÀÖ´Ù.
Announcing
the Newest Member of Doble's Family of Power System Simulators...the F6000
- Six
(6) 150 VA dc Coupled Sources
- Continuous
Max: 3-phase 30 A/phase or 1-phase 90 A
- Select
6 or 12 Sources for Test Flexibility
- 50%
More Power in Transient Mode
- 1.5
Seconds Max: 3-phase 60 A/phase or 1-phase 180 A
- Multiple
Ranges for Current Sources Supply More Power Over the Entire Range
- Convertible
Voltage/Current Sources for High Impedance Protection Scheme Testing
- 8
Fully Isolated Software Configurable Logic Inputs and Outputs
F6150
Power System Simulator Control Center - Intuitive
Controls for Quick and Convenient Relay Testing
- Up
to Eight (8) Timers for Measurements of Multiple Events in Scheme Testing
- Real Time
Phasors Display
- Simplifies
Test Setup for Complex Protection Schemes
- Fault
Rotate
- Allows
Testing of 3-phase Relays for all Types of Faults without Rewiring the Protection
Scheme
- Pre-programmed
and User Defined Ramp Values and the Autosense Feature Eliminate Manual Errors
in Testing
- Individual
Control of Sources, Inputs, and Outputs
- Provides
Maximum Test Flexibility
ProTesT
Benefits - Automate
Relay Calibration Tests
- Standardized
Test Plans
- Increased
Productivity Reduces Testing Time
- Test
Complete Protection Schemes Under Realistic Power System Conditions
ProTest
ProTest´Â º¸È£°èÀü±â °Ë»ç¿Í Àåºñ Á¤ºñ¸¦ À§ÇÑ ¼ÒÇÁÆ®¿þ¾îÀÌ´Ù. ÀåºñÀÇ
¼öµ¿ ÀÛµ¿À» À§ÇÑ F6150 Control Panel ¼ÒÇÁÆ®¿þ¾î¸¦ Æ÷ÇÔÇϰí ÀÖ´Ù. ±×°ÍÀº ¶ÇÇÑ ÇϳªÀÇ °í°´ ¼¹ö µ¥ÀÌÅÍ º£À̽ºÀÇ ±â´ÉÀ» °¡Áø
F6150 ÀåºñÀÇ ÀÚµ¿ controlÀ» °áÇÕ ½ÃÅ´. ProTest´Â ¼¼°¡Áö °Ë»ç¹æ¹ýµéÀÇ »ç¿ëÀ» °¡´ÉÇÏ°Ô ÇÑ´Ù.:
- Steady state relay
testing
- Dynamic
state testing
- Transient
testing
- End-
to-End testing
Steady
state relay testingÀº º¸È£°èÀü±âµé°ú °èÅë»ó¿¡¼ °Ë»çµéÀ» ÀÚµ¿À¸·Î ÇÒ ¼ö ÀÖ´Â ¸¶Å©·ÎµéÀ» »ç¿ëÇÑ´Ù. ÀÌ ¸¶Å©·ÎµéÀº
reach, instantaneous overcurrent, reverse current response, pick-up °ú dropout
±×¸®°í operation and reset timing µî°ú °°Àº °èÀü±â ±â´ÉµéÀ» °Ë»çÇÑ´Ù. Dynamic state
testingÀº Ưº°ÇÑ state simulation ¸¶Å©·Î¸¦ »ç¿ëÇÑ´Ù. state simulator ¸¶Å©·Î´Â Àü·Â°èÅë »óŵéÀ» ³ªÅ¸³»´Â
Àü¾Ð°ú Àü·ùÀÇ ±âº» Á֯ļö ¼ººÐµéÀ» µ¿½Ã¿¡ Àû¿ëÇÑ´Ù. ÀϹÝÀûÀ¸·Î ÀÌ stateµéÀº pre-fault, fault, post-fault
ÀÌ´Ù. Transient testingÀº ¼±Åûç¿ëÀº ProTest T planÀ» »ç¿ëÇÑ´Ù. Transient simulation
°Ë»çµéÀº DFR ¶Ç´Â EMTP À̳ª ATP °°Àº °èÅë ¸ðµ¨¸µ Åøµé·ÎºÎÅÍ ¾ò¾îÁø Àü·Â°èÅë Á¶°ÇµéÀ» ³ªÅ¸³»´Â Àü¾ÐÀü·ùÀÇ ±âº»ÀûÀ̰í
ºñ-±âº»ÀûÀÎ Á֯ļö ¼ººÐµéÀ» µ¿½Ã¿¡ Àû¿ë½Ãų ¼ö ÀÖ´Ù.
Options (¼±Åûç¾çµé) F6150À» À§ÇÑ ¼±Åð¡´ÉÇÑ ¿©·¯ »ç¾çµéÀº
¾Æ·¡¿Í °°´Ù: option F6810 - High Power Convertible Voltage/Current Source.
³ôÀº
ºÎ´ãÀÇ E/M ŸÀÔ °èÀü±â °Ë»ç¸¦ À§ÇÑ 3°³ÀÇ Àú Àü·ù / °í
ºÎ´ã Àü¾Ð¼Ò½ºµéÀ» Á¦°ø. option F6909 - Control Panel Enable. ¼ÒÇÁÆ®¿þ¾îÀÎ ProTest F6000
ÄÁÆ®·² ÆÐ³ÎÀ» F6000
±â±â¿Í Åë½Å°¡´ÉÇϵµ·Ï ÇÑ´Ù. option F6910 - Simulator control and automation module.
ProTest ¼ÒÇÁÆ®¿þ¾î ¶Ç´Â Á¦3ÀÇ
¼ÒÇÁÆ®¿þ¾î¿Í »ç¿ë°¡´ÉÇÏ°Ô ÇÑ´Ù. option F6885 - Global Positioning System (GPS) Satellite
Receiver Interface. GPS
¾ÈÅ׳ª(option F6895)¸¦ º°µµ ÁÖ¹®ÇØ¾ß °¡´É. option F6895 - GPS Antena. option F6885¿Í
°°ÀÌ »ç¿ë. Global Positioning SystemÀº ¸Ö¸® ¶³¾îÁ®ÀÖ´Â ¿©·¯ F6000 ½Ã¹Ä·¹ÀÌÅ͵éÀ» µ¿±âÈ
½Ãų ¼ö ÀÖµµ·Ï ÇÑ´Ù. °¢ ½Ã¹Ä·¹ÀÌÅÍ ¾ÈÀÇ Àü¿øµéÀº ±×°ÍµéÀÇ Ãâ·ÂµéÀ» µ¿±âÈ ½Ã۱â À§ÇØ GPS À§¼ºÀÇ 1PPS(one-pluse-per-second)½ÅÈ£¸¦
»ç¿ëÇÑ´Ù. GPS µ¿±âÈ´Â End-to-End testing¿¡¼ Çϵå¿þ¾î¿Í ¼ÒÇÁÆ®¿þ¾îÀÇ timimg ¿ÀÂ÷¸¦ Á¦°Å ½ÃÅ´.
|